Storm Water Sanitary Drainage

AFE is classified under special class for storm water and first class for sanitary drainage including site survey, plot survey, prepare and submit shop drawings, verify the design, propose design for house connections and/or gulley connections, supply and lay GRP/PVC/VC pipe, lay and test/commission the complete network in addition to the maintenance after provisionary (preliminary) handing over.

AFE have executed multi prestigious projects which included storm/sanitary network at about 40-50% of the final contract value. In addition, AFE have executed the operation and maintenance of the existing storm water network for half (50%) of Al Ain Region which was effectively and successfully completed during March 2013.

View List of Done Project